Rowan-Classes/6th-Semester-Spring-2024/SysCon/Final Project/Draft1.log
2024-11-10 14:46:30 -05:00

24 lines
624 B
Plaintext

Circuit: * C:\users\sharpe\Documents\Rowan\Rowan-Classes\6th-Semester-Spring-2024\SysCon\Final Project\Draft1.asc
WARNING: Specified period is not longer than the sum of Trise, Tfall, and Ton for v1. Increasing period to 0.1
.OP point found by inspection.
Date: Tue Oct 1 18:27:36 2024
Total elapsed time: 0.124 seconds.
tnom = 27
temp = 27
method = modified trap
totiter = 2694
traniter = 2694
tranpoints = 1348
accept = 1315
rejected = 33
matrix size = 3
fillins = 0
solver = Normal
Avg thread counts: 1.4/1.7/1.7/1.4
Matrix Compiler1: 3 opcodes 0.2/[0.2]/0.2
Matrix Compiler2: 15 opcodes 0.2/[0.2]/0.2